Nov 11

Main configuration

Proposal for 400GPM Drilling fluids processing

1)400GPM Mud recycling + Mixing System

2)Mud storage Tank Package.

 GN500GPM Complete drilling mud system Proposal

1) 500GPM Mud Recycling System (8000Lx2300Wx1800H mud tank)

2) Mud Mixing System (Mud Tank +Mixing hopper and pump)(8000Lx2300Wx1800H).

Detailed information on the system    

About the paint on equipments and mud tanks

We always use Japan Kansai & COSCO coating and painting. The Zink-Rich Epoxy painting. For mud tank internal, there will be 2 layers, while for outside will be 3 Layers.

The client required the mud system powered by generator, so there should be information on the connection.

Mud Processing System

Mud Processing System

How does the generator connect – they prefer plugged since there is no electrician required on site. How does the slurry pump connect to the unit? (again preference is for plugged) and what length of cable is supplied? How are the shale shakers connected? (preference again is plugged). For Above 3 questions, they are all connected by Aviation plug as we always do. It’s easy for operation. And for cable supplied for submersible slurry pump we can provide free cable less than 30m.

Moreover, about all controls of the drilling fluids process. All of the labels are described by clear English for easy operation just as we’ve done from beginning. We’ve exported our products to over 30 countries, we must make all of equipments globalized design

A rather important issue is the capacity of the dirty and clean mud capacity in tanks. According to our design and client’s actual drilling situation the dirty Mud will be 1400Gallons, while clean mud is 2300Gallons. We recommend them to have an extra storage tank to increase total clean mud capacity.

Option of 500GPM drilling mud processing system

What are the options to increase the units treatment capacity to 500GPM?

We just need to change the mud mixing pump position and mount way. We kindly suggest them take mud mixing pump on a separated skid not on the tank. Or it is mounted on the storage mud tank.

Mud Tank in Mud Processing System

Mud Tank in Mud Processing System

And there should be both recycling mud tank and storage mud tank. For the 2 tanks they hold same outsize dimension for convenient transportation   The storage tank only for clean mud insure the maxim capacity.

The other design is the storage mud tank hold mud agitators and mud mixing pump. All the equipments including mud tank, it should be suitable for 40’ container cater to water shipment and their local transportation regulations. So the mud tanks length will not be over8m. All of necessary pipelines and fittings will be prepared well for whole system

Flexible installation for convenient transportaion

Considering the convenience on assemble and disassemble the whole mud recycling control system for transportation and removal. There will be also quick connectors made of Stainless steel.

Of course, it is subject to certain requirements from customer. If consider the economical cost and unnecessary removal, kindly suggest use the common flanges and pipelines connected by bolts.

They wish there is an option to run a 20m umbilical cable that provide operator control from the drillers panel. We can provide cable connect the general control cabinet but not for each single items such as only for shale shaker, mud cleaner, mud mixing pump, etc.

Infact, the mud system always can be customized according to clients’ actual requirements. Just tell us your specific requirements on system or equipment. We’ll give you professional solution timely. Come to GN and get your own system

Share

written by shale shaker \\ tags: , ,

3 Pings to “400GPM and 500GPM mud processing system”

  1. How does 110bbl drilling fluids system work? Says:

    […] 400GPM and 500GPM mud processing system […]

  2. Mud mixing pump in drilling fluids recycling system Says:

    […] 400GPM and 500GPM mud processing system […]

  3. Mud agitator for drilling mud process system Says:

    […] mud agitator under different working conditions will request related features. Usually, in drilling mud process system there should be one agitator every 3 meters. And other facors are shaft and impellers, […]


Leave a Reply