Feb 05

Although during the past 2 years, the waste management and environment protection proposals GN produced are occupying larger and larger share of all GN products, the traditional application GN Solids Control has been professional in has not lost it’s advantages. Recently, just when the oil and gas industry is picking up, GN’s international market is coming up again and a UAE client just purchased a 350GMP mud recycling system from GN Solids Control.
GNMS series mud recycling systems are one of the best seller products among all GN products, during those years, especially the 500 GPM mud recycling systems. In some jobsite, the 350 GPM mud system could serve as 500GPM mud recycling system, too.
This mud recycling system is combined by 2 phase separation equipment, plus a mixing unit. Depending on the limited space request on client’s jobsite, and also taking into consideration the transportation, the desander cones are not used in this system. For the first 2 level of separation, GN designed a double deck shaker, the lower shaker deck is served as shale shaker, with coarse meshes, .while the upper deck shaker is under the desilter cones, playing as the drying shaker for desilters.

GN Shale Shakers

GN DOUBLE DECK SHAKER

GN DOUBLE DECK SHAKER

On the other side of the tank, there is a mixing hopper, which is a common component of a mud recycling system for HDD projects. It is used to add and mix some necessary chemicals into the drilling mud.
Each year, GN Solids Control produces tens of mud recycling unit to the non-oil and gas industries, mostly for HDD, CBM, Water well drilling, TBM and Piling. All such mud systems could be grouped into 2:
1. Self-contained mud recycling systems with larger mud capacity and a mixing unit. Those systems, in application, are mostly used for HDD, CBM and etc. Normally, clients use a slurry pump to transfer mud from mud pit to this system and use mud pumps to suck out mud from the system.
2. Compact mud unit, without a mixing unit, mostly used for piling and TBM.

Share

written by shale shaker \\ tags: , , , ,

Nov 24

The service companies or project contractors are always very strict on choosing equipment manufacturers, because a good manufacturer is not only about the image and reputation, the more important thing is, the good performance of the equipment. Like for the oil and gas drilling, working on the rig means continuously operating and any unexpected failure comes at big cost.
In many projects which are in need of separation works, the shale shakers play a very important role. For example, in oil and gas drilling solids control projects, the shale shaker take over more than half of separating work, and in HDD or TBM projects, a shaker is always the first or even only separation step, even in drilling cuttings waste management projects, a high-G shaker with a 8.0G force are head in the queue.

GN NEW ORDER FOR SOLIDS CONTROL EQUIPMENT

GNZJ series shale shakers have following features:
1. High G force to ensure a good performance and good separation results. With Italy brand Oli as professional vibrating motors, GN shale shakers could reach a G force up to 7.5, and according to the jobsite condition, this G force is adjustable.
2. A strong structure of shaker deck made of stainless steel, instead of normal steel. Only a strong structure could endure the high G force vibration. That’s why GN shale shakers have a longer service life.
3. API RP 13C shaker screens with composite material frame. GN now make all its frame screens with composite material frames, it has a longer service life than steel frame ones, and the conductance is much larger. With same screen area, the unblocked area is much larger than steel frame ones.
Those above mentioned are only several features and advantages of GN shale shaker and shaker screens, since space here is limited, if you need more information about GN company and products, welcome to visit our website or contact us by email, telephone or fax directly.

http://www.gnsolidscontrol.com/application
In most of countries in the world, environment protection is very important for all industries with very strict laws. For the drilling projects, the separation standard is evens more. That’s why, GN became one of the most well-known brands during past years and its adjacent countries for the ideal separation solutions in oil and gas drilling industries and other drilling projects like HDD, TBM and etc, and even for the construction works.

Share

written by shale shaker \\ tags: , , , ,

Jul 11

Per experiences and calculated data, the drilling liquid occupies in any well drilling is between 4 percentage to 10 percentages, no matter in onshore drillings or offshore drillings. Considering its effects on the drilling operation performance, which occupies nearly 50 percentages, the drilling fluid is quite vital to the drilling.

GN Waste Management Equipment

That’s why, a professional drilling manager has to have a professional team for the drilling mud services, or find a qualified drilling fluid service company. In practice, drilling companies or drilling contractors always focus on drilling work, and employing a subcontractor for the solids control system. Each drilling rig has eight systems connected to each other, among which, the solids control system is comparably independent. An expertized drilling fluid company has the right personnel and suitable equipment, and more important, they know how to treat the fluid well.

A professional oil service companies provide following services:
1. Solids control equipment and services. The solids control systems help to treat the drilling fluid directly from the well mouth. It contains three or four phases for separation, including the shale shaker as the first phase, the desander cones as the second phase, the desilter cones as the third. Some include the decanter centrifuge as the forth one. In most solids control systems, there are mixing unit for adding more chemicals into the fluid when necessary.
2. Drilling cuttings waste management systems, in some countries, this part is also regarded as a part of solids control, because this is also for treating the solids from the drilling fluid. Those systems always contains the vertical cuttings dryer, the high G drying shaker and the decanter centrifuge.
3. Drilling fluid waste management, it is the further treatment for the drilling fluid. As the fluid has been used for a long time, this system uses some chemicals to flocculate the extra fine particles into larger ones before being separated out by a decanter centrifuge.
As one of the leading manufacturers of solids control and waste management, GN Solids Control has been providing lots of oil service companies in the world for all above mentioned systems and equipment. For more information or a formal quotation, welcome to contact GN directly.

Share

written by shale shaker \\ tags: , , , ,

Jun 26

Tomorrow, on June 27th, the yearly MIOGE will be started at Crocus Expo, in Moscow. Russia is ranked as the second largest oil reserve owner in the world, and the MIOGE is the yearly largest oil show in Russia. Every year, this oil show gained attention from all over the world, the oil service companies, drilling contractors, drilling rig manufacturers and other equipment manufacturers all gather in Moscow for business and opportunities.

MIOGE
GN Solids Control has been working with Russia for more than 7 years, and solids control equipment with brand of GN Solids Control has been well known not only in Russia, but also in other Russian spoken countries. And the equipment GN exported to those countries cover all GN product range including:
1. Solids control equipment and systems including GNZS shale shaker, GNZJ desander, desilter, and mud cleaner, GN degassers, GNJBQ series mud agitators, GNNJQ series mud guns and various pumps.
2. GN Waste Management Equipment and systems, including GNLW decanter centrifuges, GNZS HGE drying shaker and GNCD vertical cuttings dryers. And also GN dewatering units are popular in Russia.
3. GN Shaker screens for GN own brand shakers and other brand shakers. GN’s most popular screens are GN composite material frame screens.
For this year’s MOIGE, GN Solids Control will show following equipment:
GNLW594E Shale Shaker, GNLW363G-VFD Decanter Centrifuge, GNZJ594E Mud Cleaner, GN Centrifugal Degasser, and various shaker screens GN produces.
Information about the exhibition:
Exhibition Name: MIOGE 2017
Exhibition Time: from June 27th to June 30th, 2017
Location: Crocus Expo, Moscow
GN Booth Number: A239, Hall 13, Pavilion

If you have to miss this oil show, and still want to contact GN, welcome to visit our website at www.gnsolidscontrol.com, and contact GN Solids Control in China or GN Solids America in Houston.

Share

written by shale shaker \\ tags: , , , , , , ,

Jul 12

Shale shakers are first step separation for the solids control system for oil and gas drilling and other drillings. They are used to separate out particles larger than 100 microns by using shaker screens. For deep well drilling, the Tandem shale shakers are very common. They are 2 exactly same shakers to be installed on one skid.
Recently, GN has delivered to a middle east drilling company all necessary solids control equipment for 3 rigs’ package, including shale shaker, mud cleaner, mud agitators and mud guns ,and also mixing hoppers. The shale shakers for this order are tandem shakers. And the Shaker Model is GNZS594E-HB.

Tandem shale shaker

GN Tandem shale shaker

Advantages of GNZS594E-HB:
1. Patent design for the rubber sealing methods, effectively avoid leaking of mud during operation.
2. Stainless steel material as shaker deck bottom frame to endure the high G force from the vibration motor.
3. Italy brand vibration motors Oli for a strong G force available.
4. Adjustable shaker deck angle from minus 2 degrees to 5 degrees during operation with a wrench.
5. Special and new design for the screen changing method, to get the screens easily to change, more human oriented.
6. Shaker screens are composite material frame screens, for a longer service life and more HSE.
Such above mentioned features are same for other GN shale shaker models including GNZS703E, and GN mud cleaners and double deck shaker used for other applications like HDD, CBM and TBM and etc.

GN is also professional in shaker screens because:
1. As leading manufacturer of solids control shale shaker, GN knows better of shakers and accordingly, GN knows well what screens are more suitable for shakers.
2. GN has a separate factory especially for shaker screens, to better control the screens quality.
3. GN clients give feedbacks and improvement suggestions for update the technology
4. GN always use the most reliable materials for screens, and all GN products same.

Share

written by shale shaker \\ tags: , , , ,

Jul 08

Shale shaker is the primary solids control equipment in drilling water recycling system used to may help drill cuttings from water. For most of the drilling website, at least two units shale shaker will be equipped: one particular for working while the various other one is for back up, or maybe both are for working reason. Some sites even have to have three or four unit shale shakers which could handle a larger circulation rate. A tandem shale shaker is designed for easy putting together and disassembling onsite. It will always be convenient for transportation whenever moving the rig.
How exactly does Tandem Shale Shaker Do the job?
The tandem shale shaker is a design of put a couple of unit single shale shakers on a skid. These a couple of unit shaker are absolutely same for easy surgery and maintenance. As the drilling water treated by the shaker system finally will go through the line mesh shaker screen and give way to the under located mud tank, the skid was made with 2 square spaces from where the drilling water could fall into the mud tank. Both shaker sections are equipped with buffer box, some sort of provided mud distributor, regardless of pipe type or package type; the drilling water could be guided to the two shakers for separation practice. It means a tandem shale shaker could handle the particular flow rate 2 times than the usual single shaker. If you want make use of this tandem shale shaker regarding smaller drill rig, you may only run either one within it and the other one is utilized in case any break down for the first unit.

160629 tandem shale shaker
What are the great things about Tandem Shale Shaker?
one Tandems shale shaker could possibly be used flexibly as per the drilling fluids flow rate.
2 . not Convenient transportation as the skid is designed with container kind fixing point so that the complete skid could be easily placed on a flat bed trailer to some where you want.
3. Easy installation along with dismount. The operator really only need use a crane to pick up the whole skid to put about the tank and take off.
That tandem shale shaker is perfect for a very big drilling organization in Middle East. “GN’s equipment is always working great. This makes our mud manufacture very happy. That is why we place repeated order to them. ” Says a director only at that drilling company. Actually, this provider is GN’s old customers and very good friends.
Besides the Duo shale shaker unit, this kind of client also ordered an abundance of centrifugal pumps, mud agitators and mud guns via GN. These equipments they fit orderly in GN solids control’s assemblage workshop, which is really eye catching. Clients need to be well confident by good machine effectiveness. Obviously, for this clients, GN did it.

Share

written by GN Shale Shaker \\ tags: , , , ,