Drill 2012 was held on Sep. 19-21 in Adelaide by Australian Drilling Industry Association (ADIA). There, driling equipments supplier, drilling contractor and scholar in this field came to the show for exchanging their mind. As a equipments supplier, GN Solids Control shown their 200 GPM drilling mud recycling system at the exhibition.

GN 200GPM Mud System Shown in Adelaide

Conpact design for HDD Mud system

Actally, the unit we shown at the expo. is a HDD mud system. In Australia, there are many drilling contractors for HDD and CBM. So, there is large requirement for the compact strcture system. The standard configuration for GN 200GPM mud system contains 1 unit mini shale shaker, 1 unit mimi cleanr with 4 no. 4″ desilter cone, 1 unit feed pump and mixing hooper package.
For HDD, the low requirements for the drilling mud makes the centrifuge not a necessary equuipments in the process for drilling mud recycling. That is why for some mud system used in HDD always simple and portable.

 Requirement for Diamond drilling mud system

During the exhibition, we met many contractor for diamond drilling. Their requirements always come for the small treating capacity mud system.
In this type system, the equipments would be needed are very small size shale shaker and centrifuge, mostly, the treating capacity for diamond drilling is less than 40 GPM.
At this moment, GN do not offer the whole package for this system. However, we would offer a Mini model centrifuge GNLW223M for customer, the parameter below:
Treating capacity: 150l per minute
Drum diameter: 220mm
Rotary speed: 4000rpm
G force: 1930 G
Separation point: 2~5 Microns
Motor power: 11 kw

Drill 2012 was the first time for GN to show herself in Adelaide which is a so beautiful city, in October, GN would attend another exhition No-dig in Melbourne.