Sep 05

Given that its establishment years ago, GN Solids America has occupied a certain market for HDD projects and HDD companies. Like other drillings, HDD have to have cuttings dryer also. And technical specifications for HDD mud systems are higher than these of piling or TBM.

oil drilling solids control system 4
Lately, a wellknown Russian organization who majors in HDD projects has purchased a 350GPM HDD system from GN Solids America. Now this method is under pre-assembling and can be prepared for delivery close to quickly.
What equipments in this method?
1. Mud tank. This mud tank is made by GN, compact in style and efficient for storage drilling mud. Tank are divided into many compartment for various steps for treating. Tank dimension 6000*2100*1300mm
2. GNZY705-Y8S Double deck desilter mud cleaner with five panel screens along with a eight cones desilter. Because HDD includes a greater common for drilling waste management, drilling mud with cuttings very first enter reduce deck of shaker then treated mud sucked by centrifugal pump to desilter cones. Solids particles discharged from desilter fall on upper deck shaker for next step remedy.
three. GNSB6*5-9.5J Centrifugal pumps respectively for feeding desilters and jet hoppers for mixing.
4. GNJBQ Mud agitator 1 set for mud agitating.
five. GNNJQ Mud gun for helping mixing.
6. Lighting system and electric control method for full technique.
This program has a compact structure which may be transported in containers, this saves a great deal revenue for customer. Vermeer and CPP each have bought this related method from GN Solids Control.
Now GN Solids America has an additional program with capacity of 240m/hour in stock. If you have interest, pls make contact with us.

Share

written by GN Shale Shaker \\ tags: , , , , ,


Leave a Reply