Model selection of mud shale shaker

The shale shaker is chosen through the following details:

The handling capacity (GPM)

The kind of slurry, the number of the mass density, the rate of flow and temperature

Salt and/or acidity of materials (Confirm to make use of 304# stainless or 316L stainless)

Size the solids material and screening precision needed

The sums of meshes (API)

The placed-area size to put the shale shaker in oil area

The set from shale shaker

When first set-in the shale shaker, keep place the shaker on the horizontal base. The bottom has to be firmed.

Possible there’s no base, the shock-resist rubber material ought to be installed between your working table and equipment.

Take away the shipping brace like bolt and carry, since the base and screen box are connected by springs, then when ship, the above mentioned area of the devices are guaranteed through the shipping brace.

Don’t switch on the gear before take away the shipping brace.

The cables connected the vibration motors around the shale shaker always broken throughout severe vibration. Protected-cover the cable is provide and want to set up with cable when connect control panel and also the motors

When stop using shale shaker, the shale shaker screen ought to always be cleaned by water that is clean.

Installing shale shaker screen

Clean the adhesive side well and set around the shaker screen.

Install the wedge blocks in the two sides simultaneously.

Perform the test-pursue installing shaker screen to make sure installation is performed correctly. If there’s any unusual noise of poor contact, stop immediately and recheck installing shaker screen.

The tilt-position adjustment of screen box

When the level of fluid running is simply too large, the mesh screen ought to be transformed. When fluid running is small, the position ought to be modified by slanting.

The position from the screen ought to be moved based on the actual demand. The adjustment range is -1 to 5 degree. When adjust the tilt-angles, remove the pin first, release rings screws, then run the manual and/or electric hydraulic pump.

Once the shale shaker correctly works, the fluid should flows 3/4 from the whole screen, when the fluid can’t flows around needed, to be able to boost the aftereffect of cleaning; the shaker screen ought to be transformed. GN Solids Control now can provide such high quality shale shakers and shaker screens, if you want any productions, please make connection with us.

Related Arciels:

703 Shale Shaker 1

Share

written by GN Shale Shaker \\ tags: , ,

3 Pings to “Shale shaker details”

  1. Dewatering system for water based mud Says:

    […] Shale shaker details […]

  2. Obtain Your Solids Control Equipment Choose GN Solids America | GN Nodig Mud Recycling System Says:

    […] Shale shaker details […]

  3. Drilling cuttings decanter centrifuge at the jobsite | GN Decanter Centrifuge Says:

    […] Shale shaker details […]


Leave a Reply