Jan 10

Here we ‘d like to show you one set of solids control system for zj30 oil drilling rig .

The struchure of ZJ30 solids control system

The solids control  system consists of 3 mud tanks and equipments (1# shaker tank, 2# intermediate tank, 3#suction tank). The main beam of tank skid is welded by 250 H beam steel, and combined as integral skid-mounted together with the tank body. The thickness for tank wall is 6mm in all the solids control system and for base plate is 10mm. 30mm thickness grating is covered on top of tank and 168x168x×6mm round tubes (one side is to be used as clean water pipeline, the other side is to be used as pump discharge line) are furnished around tank top. The design of whole tank in the total solids control system can meet the requirements of hoisting assembly and dismantlement.  Clean water pipe lines (WP 0.5mpa), 3” mud gun pipelines (working pressure 6MPa). One 1” clean water valve is installed on the pipelines of each tank surface, backup used for diluting the mud and cleaning the equipments. Hose connection between intermediate-pressure mud gun pipelines and clean water pipelines in this solids control system.

The Flowline of solids control system

1) For the Solids control system ,The mud returned from wellhead can be treated gradually through mud return pipeline, distributor, shell shaker, degasser (when the mud contains air) and desander. In order to meet the special requirements of “pouring the mud”for solids control system, the mud returned from wellhead can flow into 1# – 2#, 3# tanks directly via mud ditch in the tank when necessary.

2) 2 sets of aggravated pump can suck mud from 3# tank. The aggravated mud can be discharged to 2#, 3# tank in the totally solids control system.

3) The shear pump can suck mud from 2# , 3#tank.

4) one 4” steel pipe is to be put onto the 2#, 3# tanks, the connection will be connected by customer.

Solids Control System is the mailly products in GN Solids Control , offcause with proffessional design and manufacture . We have exported to more than 30 contries for solids control system and equipmetns . Please feel free to contact us and we won’t let you down.

Share

written by GN Shale Shaker \\ tags: , ,

4 Pings to “Solids Control System for ZJ30 oil drilling Rig”

  1. Drilling Mud Circulation System in Mining Industry Says:

    […] years of experience, GN has been one professional manufacturer for drilling mud circulation system. Over 40 countries of sales helps GN get more knowledge for drilling mud circulation system and […]

  2. Solids Control System sold after CIPPE drilling show Says:

    […] tank was sold to a China clients and also they choose 2 units of same solids control system as the CIPPE drilling show. Each unit including […]

  3. Drilling Mud Tanks for Australian Client Says:

    […] Solids control system will be established by drilling mud tanks and solids control equipment .Defferent of solids control system will require for different size and quatity of mud tanks .Vern for same solids control system , the clients can choose different size of mud tanks and qutity . In oil & gas drilling area , large size of tank and much mud storage capacity will be required . […]

  4. ZJ40 solid control system for oil and gas drilling Says:

    […] drilling rig solid control system is designed and manufactured by our company specially for drilling fluid preparation and cleaning […]


3 Responses to “Solids Control System for ZJ30 oil drilling Rig”

  1. 1. GN Shale Shaker Says:

    Good points for solids control system . Please keep on updates

  2. 2. Solids Control Says:

    May I have a price for your ZJ30 solids control system ?

  3. 3. Lasana Marena Says:

    Please send me a quote on your Solid Control Equipment.
    Thanks

Leave a Reply