Gas Drilling solids control system aways at least 2 tanks with shale shaker, desander , desilter, centrifuge and mud tank. It will need a separate trip tank or  trip tank compartment  before sand trap for caculating or fill rig holes.

Trip Tank Dectription

Trip tank will hold mud for about 5 cubic meters or depending on different rigs and will install mud gun for transfer mud and maybe mud agitator. One or two trip pump will be needed to transfer mud to drilling hole. If you need GN build you a trip tank, the bellowing info will be needed:

1) Trip tank capacity

2) Tank size requirement

3) Your original solids control system layout and tank size with main equipment to cooperate

GN Gas Drilling Mud Cleaning Equipment other than Trip Tank

GN Solids Control is a supplier for a complete line gas drilling mud cleaning equipment incluidng shale shaker, desander desilter or mud cleaner, decanter centrifuge, centrifugal pump, mud agitator, mud gun, mud tank and related items. Shale shaker and centrifuge are the 2 most imporatant equipment, GN is able to offer separate equipment or a complete line solids control system.

Please contact us for inqury